Working closely with the main contractor, Branden Davison from Beau Vale Construction, we developed this lightweight, oak framed structure for a garden extension within the Peak District National Park.
One of the notable features was the construction and integration of a 2 metre deep heated carp pond into the design (measuring 4m x 5m) such that the extension fronted onto the pond and designed to be seen as a continuation of the ‘pavilion building’.
The large oak framed gable maximises the internal light within the vaulted extension and re-enforces the connectivity of the interior to the garden and the carp pond.